Production Leak Detection Systems


Up

 

New Applications Data Sheet:

Please fill out the following data sheet completely to submit a new application for quotation by the FTI Applications Department.  Consider this form a preliminary request for quotation.

Company Name:                                                                                             Date:
                                                          
Contact Name:

Address:

Phone (with extension):                    Fax:                                    Pager:
                                    

Leak Testing:

    Helium Mass Spectrometry (Inside/Out)                            Pressure Decay
    Helium Mass Spectrometry (Outside/In)                            Pressure Differential
    Helium Mass Spectrometry (Accumulation)                      Pressure Increase
    Helium Mass Spectrometry (Sniffing)                                Flow Test
    RGA (Residual Gas Analyzer)                                            Continuity Test
    Proof Test                                                                             Bubble Test (Immersion)
    Gross Leak Test                                                                  Vacuum Decay
   

Welding Automation:

    MIG (Metal Inert Gas)                                                           Laser
    TIG (Tungsten Inert Gas)                                                      Friction
    Plasma Arc                                                                           Not Determined
    Resistance                                                                            Other (Please Specify Below)

Assembly Automation:

    Fully Automated                                                                    Special Fastening Operations
    Manual                                                                                   Other (Please Specify)

Calibrated Standard Leak:

    New Purchase                                                                      Re-calibration
    Re-manufacture                                                                    Other (Please Specify)

Part Name:

Production Rate Desired:            Number of shifts per day:         Maximum number of operators:
pph                                   

Degree of automation:

    Manual Load                                                                          Part Counters
    Manual Unload                                                                       Good Part Marker
    Manual Sequencing                                                              Reject Part Marker
    Auto Sequencing                                                                   Fault Code Display
    Programmable Controller - Type:                 SPC Data Collection
    Auto Load                                                                              Operator Interface CRT
    Auto Unload                                                                           Gas Booster
    Light Curtains                                                                        Data Highway Interface
    Quick Changeover tooling - Time:

How many parts, models, or numbers:

Leak rate Specification:
Standard cc/sec @psi
(Example: 1.8 x 10-5 standard cc/sec Helium @ 300 psi)

Type of test media:

    Air                        Water
    Helium                 Refrigerant
    Argon                   Other (Please specify in comments section)

Test Pressure:                                Proof Pressure:                            Burst Pressure:
psi                 psi               psi

Outside part dimensions:
" W x " L x " H, or " Dia. x " H

Internal Volume of part:
cc, or in3 , or
(Include volumes of internal chambers:  i.e. fuel rails - give internal volumes for both fuel and air sides)

Test port sizes:
in., in., in., in., in., in.

Part prints available:
Yes    No
Hardcopy      Disc     AutoCAD

Part samples available:   
Yes    No

Delivery requirements:

Comments: